Micon installed and pressure grouted sixteen 40' hollow core anchor bolts and twelve 20' packer holes. Crews installed 10,500 sq ft of geogrid with rock bolts on the highwall above four projected…
16 at 40'
Hollow core anchor bolts
12 at 20'
Packer holes
10,500 sq ft
Geogrid installed
4
Mine openings protected