Mt. Washington Tunnel
Micon polyurethane grouting restored structural integrity through void filling at the Mt. Washington Tunnel for the Port Authority of Allegheny County, PA.ProblemDuring routine inspection of the…
76 years
Tunnel age at inspection
1,000 meters
Tunnel length
A few millimeters to several meters
Void height
1 AM to 5 AM
Work window
$500 per minute of delay after 5 AM
Liquidated damages
5 months, on schedule
Duration
174,000 gallons
Liquid polyurethane injected
None
Brickwork movement detected
01 — The challenge
02 — The Micon solution
03 — Project details
Project gallery
Contact
Talk to Micon
Tell us what's happening on site. Our team handles emergency response and planned ground, water and structural work.
Emergency (24/7)(412) 664-7788
Projects & estimatesinfo@themicongroup.com
Headquarters
25 Allegheny Square
Glassport, PA 15045